Background Information
Vermeer is a leading manufacturer of industrial and agricultural equipment, known for its precision engineering and innovation in machinery designed for utility, construction, and environmental applications. The company’s Boise facility supports operations across the region and continues to expand to meet growing demand.
To enhance its production capacity and improve workflow efficiency, Vermeer partnered with RRC Contractors to deliver a major facility expansion at its existing site. The new space accommodates a custom-designed overhead crane system for moving and assembling heavy machinery components, integral to Vermeer’s operations
Project Solution
RRC Contractors delivered the Vermeer expansion at 6437 W Gowen Rd, Boise, Idaho, using a Design-Build approach that integrated design, engineering, and construction from the outset. Early collaboration with Vermeer allowed RRC to engineer a bespoke crane system tailored to the facility’s operational needs while ensuring structural compatibility with the existing warehouse.
The expansion added 17,848 square feet of connected industrial space, designed for durability, workflow efficiency, and heavy-duty performance. RRC coordinated all phases of design, engineering, and construction—ensuring precise alignment between the crane installation, the building’s load-bearing structure, and the overall facility layout.
Design-Build Process Highlights
Collaborative Design Development: RRC worked closely with Vermeer engineers to conceptualize, design, and implement a crane solution capable of handling specialized heavy equipment.
Integrated Engineering and Construction: Early coordination between structural engineers and construction teams ensured seamless integration between the new and existing facilities.
Industrial Functionality: The expansion was built to support demanding production environments, emphasizing safety, efficiency, and long-term reliability.
Streamlined Delivery: By uniting design and construction under one contract, RRC reduced project complexity, accelerated timelines, and maintained full accountability for quality and performance.
Project Outcome
Completed in Autumn 2025, the Vermeer facility expansion at 6437 W Gowen Rd enhances the company’s ability to manufacture and service heavy equipment efficiently from its Boise location. The project reflects RRC Contractors’ expertise in delivering complex industrial builds through its proven Design-Build process, combining technical precision, collaboration, and construction excellence to meet the specific needs of Idaho’s industrial sector.